[infinispan-dev] 9.2.0 schedule

classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view

[infinispan-dev] 9.2.0 schedule

Tristan Tarrant-2
Dear all,

I've made some changes to the 9.2.0 schedule to adapt them to the delays
introduced during this cycle. Because of the Christmas holidays, I've
moved Final over to January.

2017-11-29 9.2.0.Beta2
2017-12-13 9.2.0.CR1
2018-01-10 9.2.0.Final

Hack on!

Tristan Tarrant
Infinispan Lead
JBoss, a division of Red Hat
infinispan-dev mailing list
[hidden email]